Jun 23, 2016

Beginning of the structural work

Around 25,000 m3 of earth have been moved in the last two months. Having disposed of about 2/3, the remainder is going to be used for the site’s landscaping and redesign.

In the next step, vibrated stone columns were driven into the soil to stabilize the load-bearing capacity of the building ground. Now everything is prepared for the structural work – the crane was erected on 21 June and the reinforcement work for the base plate of our future engineering room has started.

Teaser_Unternehmen_Newsticker_Rohbauarbeiten_600x338.jpg
Bild2_Beginn-Rohbau_600x338.jpg
To the top